PipelineFX Forum

Qube! => Installation and Configuration => Topic started by: jburk on January 02, 2014, 07:05:10 PM

Title: How to set the starting job id to other than 250
Post by: jburk on January 02, 2014, 07:05:10 PM
From our on-line docs at: http://docs.pipelinefx.com/x/doh

This has to be done with an SQL statement, and should be done after the supervisor installation has been performed.

To start numbering new jobs at 1001, run the following:

mysql -u root -e "INSERT INTO qube.jobid (id,realid,serverid) VALUES(1000,1000,0)"

This can be done on a running supervisor, there's no need to stop it before executing this statement.