Author Topic: PipelineFX public repository and FTP server scheduled maintenance 10/21  (Read 7379 times)

jburk

  • Administrator
  • *****
  • Posts: 493
The public repository which hosts the manifest files and installer packages (MSI, RPM, DMG) used by the Qube installer will be offline for maintenance for approximately 2 hours beginning 18:00 PDT (UTC -7) October 21st.  The following services will be unavailable or unreachable during this time:

http://repo.pipelinefx.com
http://ftp.pipelinef.com
ftp://ftp.pipelinefx.com

The Qube Installer will not be able to reach the PipelineFX public repository during this time, but will still be able to perform installations, upgrades, etc from any local repository you have configured.  If you anticipate doing any installations or upgrades during this time, you may use the Installers "Download Only" option before the scheduled maintenance begins to populate your local repository.