I'm wondering if anyone knows of a reason this could happen. I upgraded my supervisor, workers and clients to 6.5-2 and now the same render job I have been rendering is taking roughly 4x as long. I upgraded through the installer, so it was fairly automated, all my settings should have stayed the same.
Each frame used to take about 45 sec and now is taking over 5 min.
I don't think anything else could have happened on the supervisor machine, but I'm not 100% sure. What could have even changed to see a difference like this?