Author Topic: PipelineFX FTP and web site down for scheduled maintenance late Saturday, 9/28  (Read 6558 times)

jburk

  • Administrator
  • *****
  • Posts: 493
Our hosting provider will be upgrading the VM platform which hosts our FTP and web server on Saturday evening, September 28th.

Maintenance will begin at 21:00 PST, and is expected to take between 1 and 2 hours.  No FTP or web services will be running during this time.

This also means that the Qube Installer utility will not be able to access our public repository, fetch manifest files, or download any installation packages while the maintenance is ongoing.  It will continue to work with any local repositories that you have.
« Last Edit: September 27, 2013, 10:08:42 PM by jburk »